Caliche & excavation
Hard desert soil can change what excavation looks like once work begins.
A finished pool can look simple. Building one isn’t. This video walks through the major stages behind a custom pool so you can see what happens before the first swim.
Every property has its own details, but these are the big pieces homeowners usually want to understand before construction starts.
The project starts before excavation. Design, engineering, approvals and permitting need to line up before the yard changes.
The pool is laid out on the property and excavation begins. Access, soil conditions and the shape of the design all matter here.
The structure and systems start coming together behind the surfaces you’ll eventually see.
Concrete forms the permanent pool shell and establishes the structure of the pool, spa, benches, steps and built-in features.
The finished pool begins to take shape as tile, equipment, hardscape and surrounding details are installed.
The pool receives its interior finish, fills with water and moves through startup before handoff.
Dig day gets the attention, but a successful pool project starts much earlier. The design has to work on the actual property. Engineering has to support it. Equipment needs to be planned. Access needs to be considered. Permits and HOA requirements may need to be cleared.
Las Vegas pool construction comes with conditions homeowners in other markets may never need to think about.
Hard desert soil can change what excavation looks like once work begins.
Extreme temperatures affect crews, materials and how certain construction stages are managed.
Side-yard access, walls, landscaping and neighboring structures can influence equipment access and staging.
Depending on the property, construction may involve municipal approvals, HOA requirements or both.
A pool build moves through different trades, inspections and curing or installation stages. Some work happens quickly. Other stages depend on what needs to happen before the next crew can move forward.
The best time to solve a design question is before construction starts. That’s why the planning and 3D design stage matters.
The construction stages disappear into the finished backyard. Explore the details homeowners actually see and use when the project is complete.
You don’t need to know construction terminology before you start. These are the questions worth understanding early.
See all pool & backyard FAQsGreenCare coordinates the required permitting and approval steps as part of the project process.
The design is developed and reviewed before construction begins so the major dimensions, features and overall layout are established first.
Much of the pool’s plumbing and electrical infrastructure is installed during the structural stages, before finished surfaces conceal those systems.
Shotcrete is pneumatically applied concrete used to form the structural shell of a custom concrete pool.
Water is added near the end of construction after the interior finish is installed and the pool is ready to move into startup.
Some changes may be possible, but changes after construction begins can affect cost, scheduling or completed work. It is better to resolve major design decisions beforehand.
Approvals, inspections, weather, access, soil conditions, material availability and changes to the project can all affect timing.
Tell GreenCare what you want to build. We’ll start with the property, the priorities and the finished backyard you’re trying to create.